CNSP Performance Report Template

  • Narrative provided on Internet Availability
  • Version Control Tab added
  • Updates to the availability percentages to align it to the OF on the Availability Measurement Points

This is classed asa Minor change and therefore any comments must be received before close of play on 3rd February 2020.

Comments to be sent to HSCN@Innopsis.org

No comment is assumed to be acceptance

Comments

  1. There appears to be no unique change reference for the change
  2. Availability Measurement Points worksheet; “TOPS13a: Access Connectivity Availability: 1 to 2 either resilient 99.5% or non-resilient 99.9%” – this measurement does not match TOPS13a in the Obligations Framework, which states: “- For resilient access connectivity services a minimum end to end service availability of 99.5% as measured over the reporting period as specified in the HSCN CN-SP Service Management Requirements Addendum.
  3. For non-resilient access connectivity services a minimum end to end service availability of 99.0% as measured over the reporting period as specified in the HSCN CN-SP Service Management Requirements Addendum.”
  4. This discrepancy was reported on 14th January 2020 against an earlier version of this template, the other comments made on 14/01 appear to have been addressed (despite the change overview stating “Updates to the availability percentages to align it to the OF on the Availability Measurement Points”).
  5. I suggest this change is rejected as this error is still present